Portmore Park & District Residents Association

Supporting local heritage, quality of life and community

  • Home
  • About
  • Join
  • Links
  • Contact
  • Archive
  • Guest pieces
  • Privacy
  • Events
  • Planning
  • Parking
  • Traffic
  • Schools
  • Green Belt
  • Riverside
  • Litter
  • Surrey
  • Opinion

Archives for April 2016

Walton Lane Environment Agency flood meeting

Residents of Walton Lane, Weybridge, have gained new insights into the Thames Scheme flood plans by talking directly with people working for the Environment Agency on modelling river flows and levels.

A very informative meeting in Walton Lane on 25 April 2016 was attended by local residents, including PPDRA committee members Doug Myers and Miles Macleod. In the course of the meeting, at the request of local residents, it was agreed that flows of specific alternatives to widening Desborough Cut would also be modelled.

Headline learnings from the meeting include:

  • The 2014 floods were a ‘1 in 15 year’ event, based on historic evidence
  • Flooding has been unusually light in the Thames Valley for the past 40 years, so public expectations of flood risk are low compared with historic reality (and possible extreme events from climate change add more risk)
  • Flood Relief Channel 3 which discharges at Weybridge would carry its full design flow of 150 cumecs (cubic metres per second) at much lower total river flow volumes than reached in 2014 (which was 500 cumecs)
  • The flood relief channels would INCREASE the projected risk of Weybridge flooding unless something is done to increase flow downstream of Weybridge
  • The criterion of acceptability is that the works must NOT increase the predicted river levels for projected flood flows at any point (so downstream works are essential)
  • Widening the Desborough Cut on its south bank is considered to be the cheapest option to increase flow downstream (requiring driving in new vertical sheet piling to define the new bank and excavation of the current bank)
  • Widening on the northern bank of the Desborough Cut would be more expensive, as it has developed into a more natural kind of shelving bank with many trees limiting flow
  • Cost is a critical factor
  • Modelling predicts that Desborough Cut does not need to be widened much along its lower half: widening the upper half and dredging at the first bridge would increase flow sufficiently
  • Widening the bridges would be very expensive (and has not been budgeted for)
  • The 2014 floods scoured the river bed at the first Desborough bridge, significantly increasing the depth at that point
  • The Environment Agency are looking into potential alternatives to widening Desborough Channel (but the indications were not particularly positive)
  • Cutting ‘Doug’s Channel’ through Point Meadow (the north-west horn of Desborough Island) would also require widening or dredging of the remainder of the northern old river loop, which would be costly
  • The modelling team agreed to model the effect of this northern alternative approach on local levels and flows

Modelling of levels and flows is a highly complicated process, and not a precise science

  • 1D modelling is relatively quick, but only considers the flow within the confines of the river
  • 2D modelling includes flow in the adjacent flood plain, when levels are high, but is slow and very complex
  • Peer reviewing is a hands-on process, involving CH2M (formerly Halcrow) peer reviewing the JDA model and the design works, in “a process of questions and answers that get to an agreed design”
  • The overall margin of error in modelling appears to be higher than some of the predicted local changes in level which modelling suggests the scheme will produce, though the calculation of possible modelling error is far from straightforward
    (Editor Comment: A truly robust approach would demand that the projected effects must be greater than the margin of error. However, logically the estimated margin of error of modelling can only be based on experience of disparity between modelled flows and actual measured flows.)

Future action timescale

  • Currently the River Thames Scheme has Treasury approval for the outline case (as previously reported)
  • Modelling with the latest data is in progress, 1D now,  2D in the coming months
  • A definitive outline design is planned by the end of 2016, following workshops
  • Scheme detailed design will follow that
  • Works timetable is for weirs work in 2018, relief channels in 2020

LATEST NEWS: UPDATE FROM ENVIRONMENT AGENCY 26 MAY 2016 SHOWS FUNDING SHORTFALL

Search

Local News – Downloads

Help save our local riverside car park – comment by 27 April 2025

Weybridge Health Centre Pedestrian and Cycle Access from PPR (PDF 2MB)

PPDRA Newsletter January 2024 – Consultation Special

PPDRA Newsletter September 2023

WEYBRIDGE HUB REDEVELOPMENT Surrey County Council Cabinet Report (June 2023)

Walton Lane Open Space — PPDRA Evidence for Local Green Space

EBC Local Green Spaces study – further spaces – PPDRA submission (07-2022)

PPDRA 2022-0980 letter re St Catherines Beales Lane Weybridge

PPDRA 2022-0397 letter re Garages to the side of 16-17 Grenside Road

PPDRA 2022-0395 letter to EBC re Garages off Grenside Road Weybridge

UPDATED PPDRA Comments for WeyBetterWeybridge (Sept 2021)

PPDRA 2021-4412 letter  re Blenheim House Church Walk Weybridge KT13 8JT

Town Centre: PPDRA Comments for WeyBetterWeybridge (April 2021)

PPDRA 2021-0045 letter to EBC re Las Lilas Devonshire Rd (Mar 2021)

PPDRA 2020-3496 letter to EBC re Grenside Road garages (Mar 2021)

Weybridge Parking Review 2019-20 Decision Report (Jan 2021)

PPDRA 2020-3495 letter to EBC re Grenside Rd garages (with pictures)

PPDRA 2020-2821 letter to EBC re Thames St Warehouse (Dec 2020)

Weybridge Parking Review 2019-20 maps + Wey Road & Round Oak Rd CPZ (Sep 2020)

Parking Review 2019-20 Statement of Reasons (Sep 2020)

Elmbridge Local Plan 2019 Consultation – PPDRA Submission (pdf)

LOCAL PLAN SPECIAL NEWSLETTER  (August 2019 – pdf)

News Articles

  • April 2025 (2)
  • January 2024 (2)
  • October 2023 (1)
  • September 2023 (3)
  • August 2023 (4)
  • June 2023 (1)
  • May 2023 (1)
  • January 2023 (1)
  • December 2022 (1)
  • July 2022 (1)
  • May 2022 (1)
  • January 2022 (1)
  • October 2021 (1)
  • June 2021 (2)
  • April 2021 (1)
  • January 2021 (1)
  • September 2020 (1)
  • February 2020 (1)
  • January 2020 (1)
  • September 2019 (1)
  • August 2019 (1)
  • July 2019 (2)
  • June 2019 (1)
  • May 2019 (1)
  • March 2019 (1)
  • December 2018 (2)
  • November 2018 (1)
  • October 2018 (2)
  • September 2018 (3)
  • August 2018 (2)
  • July 2018 (1)
  • June 2018 (1)
  • December 2017 (1)
  • November 2017 (1)
  • October 2017 (1)
  • September 2017 (2)
  • July 2017 (1)
  • February 2017 (1)
  • January 2017 (2)
  • December 2016 (1)
  • September 2016 (2)
  • August 2016 (1)
  • July 2016 (1)
  • June 2016 (1)
  • May 2016 (2)
  • April 2016 (1)
  • February 2016 (1)
  • January 2016 (2)
  • December 2015 (1)
  • November 2015 (1)
  • October 2015 (3)
  • September 2015 (1)
  • June 2015 (1)
  • April 2015 (1)
  • March 2015 (1)
  • February 2015 (1)
  • January 2015 (1)
  • December 2014 (1)
  • November 2014 (2)
  • October 2014 (2)
  • August 2014 (4)

Copyright Portmore Park & District Residents Association 2002-2023